Quick Answer: A good renovation quotation in Singapore is itemised by trade (hacking, masonry, carpentry, electrical, plumbing, ceiling, painting, glass and aluminium, cleaning and permits). Every line shows a quantity, a unit (per sq ft, per foot run, per point or per job), a unit price and the materials or brands to be used. Check what is excluded, how variation orders are priced, and whether payments are tied to milestones. A deposit of 10–20% is typical, and the final 10% should only be paid after defects are fixed. Compare at least three quotes on the same scope rather than just the total price.

Most homeowners look straight at the total at the bottom of a renovation quotation. But the total tells you very little. Two quotes with the same final figure can include very different scopes, materials and levels of workmanship. And a quote that looks cheap may simply be missing items that come back later as extra charges.

In this guide, the team at Han Yong explains how to read a renovation quotation in Singapore line by line, what each unit means, the red flags to watch for and how to compare quotes fairly.

What a Good Renovation Quotation Should Include

A professional quotation is organised by trade, with each item clearly described. You should see sections like these:

  • Hacking and demolition: Removal of walls, tiles, cabinets and debris disposal
  • Masonry and wet works: Screeding, tiling, waterproofing and new partition walls
  • Carpentry: Kitchen cabinets, wardrobes, TV console, shoe cabinet and other built-ins
  • Plumbing: Pipe works, installation of sinks, taps, WC and water heater
  • Electrical: Power points, lighting points, rewiring and DB box works
  • Ceiling and partition: False ceilings, cove lighting boxes and drywall partitions
  • Painting: Walls, ceilings and doors
  • Glass and aluminium: Shower screens, windows and sliding doors
  • General: Floor protection, haulage, cleaning and HDB or MCST permit applications

Each line should show four things: what is being done, how much (quantity), the unit of measurement and the unit price. If a section only has a single lump sum with no details, ask for a breakdown.

Understanding the Units in Your Quote

Renovation work in Singapore is priced in different units depending on the trade. Knowing them helps you check whether the quantities are realistic.

UnitUsed ForWhat to Check
Per square foot (psf)Tiling, screeding, flooring, false ceilingIs the area measured correctly?
Per foot run (ft run)Kitchen cabinets, wardrobes, TV consoles, shoe cabinetsIs height and depth stated?
Per pointElectrical points, lighting points, plumbing pointsHow many points, and where?
Per job / lump sumHacking a wall, rewiring, haulage, cleaningIs the scope clearly described?
Per bathroomWaterproofing and retilingDoes it include floor and walls?

For example, carpentry at “$250 per foot run” means nothing unless you know the height, the material of the carcass, the laminate brand, the type of doors and whether soft-close hinges are included. Our guide to built-in carpentry costs explains typical rates.

Benchmark Rates to Sanity-Check Your Quote

These 2026 market estimates can help you spot items that look unusually high or low:

ItemTypical 2026 Range
Kitchen cabinets (top and bottom)About $180 – $360 per ft run
WardrobesAbout $200 – $360 per ft run
TilingAbout $6 – $12 psf
Electrical pointsAbout $45 – $90 per point
Bathroom waterproofing and retilingAbout $3,100 – $4,700 per bathroom
Whole-flat paintingAbout $1,600 – $5,200 depending on flat size

Prices vary with materials, design and site conditions, so use these as a guide, not a fixed rule. For full budgets by flat type, see our HDB renovation cost guide.

Check the Materials and Specifications

Check the Materials and Specifications

The materials listed in your quotation have a big effect on how long your renovation lasts. Look for:

  • Brands and models for tiles, laminates, sanitary wares, taps and countertops
  • Carcass material for cabinets, such as plywood or moisture-resistant board
  • Finishes, such as laminate, veneer or spray paint
  • Hardware, such as soft-close hinges, drawer runners and sliding tracks
  • Thickness of glass, aluminium framing and countertops

If an item only says “tiles” or “cabinet”, ask for the specification in writing. Vague descriptions make it easy for cheaper materials to be substituted later.

Ready to Recreate Your Living Space? Book an appointment today! Get a Customised Estimate →

Watch for Exclusions

Many disputes happen because homeowners assume something is included when it is not. Ask your contractor to confirm in writing whether these are included:

  • Countertops (often priced separately from cabinets)
  • Haulage and debris disposal
  • Cement screeding under new tiles
  • Bathroom waterproofing after hacking
  • Extra power points and data points
  • Professional Engineer endorsement where walls are hacked
  • Light fittings, appliances, curtains and loose furniture
  • Air-conditioning supply and installation

A quote that leaves out a whole trade is not cheaper. It is simply incomplete.

Payment Terms and Milestones

A well-structured quotation links payments to completed work, not just to dates. A common structure looks like this:

  1. Deposit on signing: About 10%, and generally no more than 20%
  2. After hacking and masonry: A progress payment
  3. After carpentry installation: A further progress payment
  4. On handover: The final 10%, paid only after defects are rectified

Avoid contractors who ask for a large upfront payment before any work begins. Paying by milestone protects you and keeps the project moving.

Variation Orders: The Hidden Cost

A variation order (VO) is any change to the agreed scope after you sign, such as adding a power point, changing a tile or extending a wardrobe. VOs are normal, but they should be:

  • Quoted in writing before the work is done
  • Signed off by you
  • Priced at the same unit rates as the original quotation

Unusually low quotations sometimes rely on VOs to recover costs later. Ask how VOs are priced and what happens to materials already ordered if you change your mind.

Red Flags in a Renovation Quotation

  • A single lump sum with no breakdown
  • A total far lower than other quotes for the same scope
  • No brands, materials or measurements
  • A deposit request above 20%
  • No validity date, timeline or payment schedule
  • No mention of permits for HDB or condo works
  • No company details, licence or registration number

If you are renovating an HDB flat, check that the contractor is listed in the HDB Directory of Renovation Contractors. Only listed contractors can apply for permits. Our HDB renovation permit guide explains which works need approval.

How to Compare Quotes Fairly

  1. Give every contractor the same brief. Use the same floor plan, scope list and material preferences.
  2. Lay quotes side by side by trade. Compare carpentry against carpentry and electrical against electrical, not just totals.
  3. Check what is missing. Add the cost of excluded items to each quote.
  4. Compare unit rates. Look for prices that are far above or below the others.
  5. Look beyond price. Consider experience, portfolio, communication and warranty. Our articles on what makes a good renovation contractor and why experience and expertise matter go into this in more depth.

Transparent Quotations With Han Yong

At Han Yong, every project begins with a clear, itemised quotation. As an HDB-licensed contractor (licence no. HB-02-0289A) with over a decade of experience, we believe homeowners should understand exactly what they are paying for.

Through our four-step process of Consult, Propose, Develop and Reveal, you receive a Letter of Agreement listing every item, the materials used, the timeline and a milestone payment schedule, with no hidden costs once works begin. Learn about our approach to compliance and certification, browse our HDB renovation and condo renovation projects, or read about our team.

Sign-up to our Four-Step Property Renovation Plan Today! Get a clear, itemised quotation for your home. Get a Customised Estimate →

Frequently Asked Questions

What should a renovation quotation include?

It should be itemised by trade, with each line showing the work description, quantity, unit, unit price and materials or brands. It should also state exclusions, the timeline, the payment schedule, the validity period and the contractor’s company details.

How many renovation quotes should I get?

Get at least three quotations based on the same floor plan and scope. This lets you compare unit rates and spot missing items, rather than just choosing the lowest total.

How much deposit should I pay a renovation contractor?

A deposit of about 10% is common, and it generally should not exceed 20%. The remaining payments should be tied to completed milestones, with the final 10% held until defects are rectified.

What is a variation order in renovation?

A variation order is a change to the agreed scope after signing, such as extra power points or different tiles. It should be quoted and approved in writing before the work is done, ideally at the same unit rates as the original quote.

Why is one renovation quote much cheaper than the others?

A much cheaper quote often leaves out items like haulage, screeding, waterproofing or countertops, or uses lower-grade materials. Check the scope and specifications line by line before deciding.

Should I sign a contract or just a quotation?

Always have a signed written agreement that includes the itemised quotation, materials, timeline, payment schedule, variation order terms and warranty. Verbal promises are hard to enforce if a dispute arises.